Terminal 2, Leeds Bradford Airport

Farrans Construction

Hoardtek was engaged to replace the existing on-site system with a solution capable of withstanding wind loads specific to the location, as well as accommodating a 0.74kN notional load. The project involved upgrades across six different locations around the site, along with the implementation of several bespoke solutions tailored to each area’s unique requirements.

Leveraging the versatility of the Hoardtek system, we expertly balanced space efficiency and budget considerations across the airport’s renovation project. The challenge involved securing six landside and three airside areas, each with unique requirements.

To maximize space and control costs, Hoardtek installed compliant freestanding hoardings in both 800mm and 1400mm widths, tailored to each location’s needs. Our solutions ensured full compliance while maintaining a tidy and professional site appearance.

Additionally, bespoke scaffolding and hoarding solutions were implemented to provide safe, uninterrupted passage for airport customers between Terminals 1 and 2 throughout the renovation and construction phases. This thoughtful approach allowed the project to progress smoothly, ensuring a positive experience for all passengers and staff.

This project highlights Hoardtek’s ability to deliver innovative, adaptable, and customer-focused hoarding systems in complex, high-traffic environments.

Images are restricted due to the specific location of the works.

Location

Project gallery

Proin quis fringilla mauris, ac lacinia diam. Fusce ac porta urna, eu maximus orci. Maecenas rutrum iaculis risus, sed efficitur massa ornare vel. Sed at dui maximus, varius felis vel, rutrum mi. Nam mattis eros nec nisl ullamcorper, vel maximus tortor pharetra. Phasellus vel accumsan ante.

Sarah Southerington
Head of marketing
Henry Boot Logo

Nulla scelerisque, leo vitae aliquam interdum, urna ante efficitur justo, sit amet varius enim mauris vitae mi. Mauris egestas lectus quis ex pharetra vehicula. Maecenas aliquam tincidunt dolor, ut vestibulum erat sollicitudin at.

John Smith
Head of marketing
Kier Group Logo

Related projects

Hoardtek Green Corner Overlay
Hoardtek Neq Image8
NEQ Building, Southampton University
Kier Construction
Hampshire
Hoardtek Green Corner Overlay
Hoardtek Clifton Moor Image 3
Dunelm, Clifton Moor, York
Simpson (York)
Yorkshire

Have a project in mind you'd like to discuss with us?